Havis Rugged Docking Station for Zebra TC73/TC78 Mobile Computers (DS-ZEB-701)

Extended Lead Time:
2-4 Weeks

$11923

SKU: DS-ZEB-701

Description

Product Features

  • Supports Public Sector, Retail, Hospitality, Warehouse & Distribution, Energy & Utilities, Field Service, and other demanding environments
  • Robust docking solution for Zebra TC73/TC78 and Workstation Connect
  • Charging and data transfer via user replaceable USB-C cable
  • Easy access to all TC73/78 buttons
  • One handed docking and undocking
  • Compact and lightweight design
  • Supports extended battery and hand strap
  • Polycarbonate construction ensures strength, ruggedness and extreme temperature resistance
  • Rounded edges and corners for comfort and safety
  • Integrated AMPs mounting pattern

Product Specs

  • Dimensions: 9.06” (23.0 cm) H x 4.20” (10.7 cm) W x 2.19” (5.6 cm) D
  • Compatible Packages: PKG-DS-ZEB-701
  • Mounting: AMPS
  • Communication Interface: USB-C to USB-C cable
  • Working Voltage: 5 VDC
  • Operating environment: -20°C to 50°C (-4°F to 122°F)
  • Storage environment: -40°C to 85°C (-40°F to 185°F)
  • Testing: Vibration Testing: MIL-STD 810H 514.8 Crash Testing: SAE J1455 30 mph Cycle Testing: Dock and undock for 20K cycles Environmental Testing: Hot/cold operating -20°C to 50°C (-4°F to 122°F) Environmental Testing: Hot/cold storage -40°C to 85°C (-40°F to 185°F)
  • Product weight: 0.65 lbs. (0.29 kg)
  • Gross Weight: 1 lbs

Availability, Lead Times and Shipping

Please note that ALL Gamber-Johnson and Havis mounting and docking equipment typically takes at least a week to ship. Lead times can often be 3-6+ weeks or longer depending on the exact items purchased. The following is guidance only and changes frequently.

  • Basic mounting hardware such as plates or poles: 1-2 weeks to ship
  • Vehicle-specific kits or more complex mounting solutions: 2-4 weeks to ship
  • Powered docking stations with port replication: 4-8+ weeks to ship.

Please call, email, or chat with us to discuss lead times as it specifically relates to your needs. Expedited shipping methods selected at checkout do not speed up lead times but rather reduce transit time when an order ships.

Additional information

Weight 1 lbs
Brand

Havis

Description

Description

Product Features

  • Supports Public Sector, Retail, Hospitality, Warehouse & Distribution, Energy & Utilities, Field Service, and other demanding environments
  • Robust docking solution for Zebra TC73/TC78 and Workstation Connect
  • Charging and data transfer via user replaceable USB-C cable
  • Easy access to all TC73/78 buttons
  • One handed docking and undocking
  • Compact and lightweight design
  • Supports extended battery and hand strap
  • Polycarbonate construction ensures strength, ruggedness and extreme temperature resistance
  • Rounded edges and corners for comfort and safety
  • Integrated AMPs mounting pattern

Product Specs

  • Dimensions: 9.06” (23.0 cm) H x 4.20” (10.7 cm) W x 2.19” (5.6 cm) D
  • Compatible Packages: PKG-DS-ZEB-701
  • Mounting: AMPS
  • Communication Interface: USB-C to USB-C cable
  • Working Voltage: 5 VDC
  • Operating environment: -20°C to 50°C (-4°F to 122°F)
  • Storage environment: -40°C to 85°C (-40°F to 185°F)
  • Testing: Vibration Testing: MIL-STD 810H 514.8 Crash Testing: SAE J1455 30 mph Cycle Testing: Dock and undock for 20K cycles Environmental Testing: Hot/cold operating -20°C to 50°C (-4°F to 122°F) Environmental Testing: Hot/cold storage -40°C to 85°C (-40°F to 185°F)
  • Product weight: 0.65 lbs. (0.29 kg)
  • Gross Weight: 1 lbs

Availability, Lead Times and Shipping

Please note that ALL Gamber-Johnson and Havis mounting and docking equipment typically takes at least a week to ship. Lead times can often be 3-6+ weeks or longer depending on the exact items purchased. The following is guidance only and changes frequently.

  • Basic mounting hardware such as plates or poles: 1-2 weeks to ship
  • Vehicle-specific kits or more complex mounting solutions: 2-4 weeks to ship
  • Powered docking stations with port replication: 4-8+ weeks to ship.

Please call, email, or chat with us to discuss lead times as it specifically relates to your needs. Expedited shipping methods selected at checkout do not speed up lead times but rather reduce transit time when an order ships.

Additional information

Weight 1 lbs
Brand

Havis

SHIPPING AND LEAD-TIMES
In general, Panasonic Toughbooks, accessories and related mounting equipment are enterprise solutions that are typically custom built to order and thus carry a lead-time of anywhere from 2-3 weeks to 2-3 months. Please be advised that online orders where expedited shipping is chosen does NOT mean that specific product is in stock and will ship right away. It simply means we will ship via the selected method when the product is available to ship. We can only confirm availability over the phone or online chat. While we do our best to have a wide variety of Toughbook models and accessories in stock, this particular supply chain is challenging and we ask that customers please confirm availability with us on the phone when time is a priority. Additionally, expedited shipping will not apply to multiple items that might have multiple lead-times and ship dates. It is typically applying to the main item of an order. Again, please call us ASAP at 877-532-8088 to discuss urgent needs and expedited shipping.

Crop Image